Exam program: Engineering projects: construction and energy
IAE-EXAM-EN · version 1.0
Sections and weights, topics, format, sample tasks with the rubric, scoring and the limits of the IAE written exam in Engineering Projects: Construction and Energy.
01. Who is the exam for?
For construction and energy project managers, project and site engineers, contract and claims specialists, cost engineers, commissioning managers and energy managers with a bachelor's degree or higher and at least 3 years of experience on such projects (5 years without a degree). The exam tests decisions based on a project's figures and terms: schedule, cost, risks, changes, contract, commissioning and handover. It is not tied to one form of contract or method: FIDIC, NEC, AIA, contracts under the Civil Code of the Russian Federation and company standards count if the decision is justified by the terms of the task.
02. Format
- 5 questions, one per section, 10 minutes each.
- 2 cases of 25 minutes on program topics: a delay on the critical path, earned value, risks and changes, a claim for a variation, payback of energy measures, a punch list before handover.
- 1 question about the project from the candidate's questionnaire, 10 minutes.
- Up to 2 hours in total, in one sitting. Pasting is disabled, and each candidate gets their own figures and conditions in the tasks. Reference materials may be used.
03. Sections and weights
- S1. Planning and critical path - 20 %.
- S2. Cost and earned value - 20 %.
- S3. Risks and changes - 20 %.
- S4. Contracts, claims and variations - 20 %.
- S5. Commissioning, energy efficiency and handover, including safety as a project risk - 20 %.
Sections S1-S3 are close to the Project and business management program, but their tasks are built on construction and energy projects. Sections S4 and S5 are specific to the industry. The question about the candidate's own project belongs to section S5.
04. Section topics
- Planning and critical path: network schedules, total and free float, three-point duration estimates, resources and levelling, schedule compression at the lowest cost, long-lead equipment, acceptance of the contractor's baseline schedule, reliability of the weekly plan.
- Cost and earned value: PV, EV, AC, CPI and SPI by work package, EAC forecasts and TCPI, rules of credit, interim payments, advances and retention, price adjustment, adequacy of the reserve.
- Risks and changes: the risk register, expected cost of risk, responses and their price, P50 and P80 simulation results, additional ground investigation, decisions before permits, the flow of changes and their effect on time.
- Contracts, claims and variations: choice of contract type, notices and deadlines, valuation of variations and new rates, concurrent delay, extensions of time and prolongation costs, liquidated damages, target cost contracts, loss of productivity.
- Commissioning, energy efficiency and handover: functional and integrated tests, acceptance tests of equipment and plants, punch lists and practical completion, partial takeover, payback and NPV of energy measures, weather-adjusted verification of savings, site safety indicators, choice of method for work at height.
05. Sample tasks
Sample question (section S1, 10 minutes). A pumping station, all links finish-to-start: A - excavation and base, 12 days; B - erection of the precast building, 18 days, after A; C - installation of pumps and pipework, 15 days, after A; D - electrical equipment and controls, 10 days, after B; E - pipework pressure testing, 4 days, after C; F - commissioning, 6 days, after D and E. 1) Find the critical path, the duration and the total float of the activities off the critical path. 2) The client asks to finish 4 days earlier. Which activities would you shorten, and under what condition is shortening one branch not enough?
How this answer is scored:
- Correctness (40): paths A-B-D-F = 46 days and A-C-E-F = 37 days, critical path A-B-D-F, duration 46 days, total float of C and E - 9 days; activities on the critical path or the shared activities A and F are chosen for the 4-day reduction.
- Reasoning (25): the choice of activities is explained by the cost and resources of acceleration; it is shown that the float of the other branch (9 days) exceeds 4 days, so it does not become critical.
- Risks and constraints (20): crews working together, safety and quality when installation and commissioning are accelerated; if the float of the other branch were smaller than the reduction, both branches would become critical.
- Clarity (15): the answer is structured in points, and figures and conclusions are stated explicitly.
Sample case (section S5, 25 minutes). A shopping centre uses 4,000 MWh of electricity a year at $130 per MWh. Two measures are proposed. M1 - LED lighting with controls: $260 thousand, saving 900 MWh a year, service life 12 years. M2 - variable speed drives on air handling unit fans: $180 thousand, saving 600 MWh a year, service life 10 years; the utility refunds 25 % of the cost of M2 after the savings are verified over 12 months. Discount rate 8 %, annuity factors: 12 years - 7.536, 10 years - 6.710. The measures do not affect each other. This year's budget is $300 thousand.
- 1) Calculate the annual saving, simple payback and NPV of each measure.
- 2) How does the conclusion change if the tariff falls by 15 %?
- 3) Which measurement and verification plan is needed to receive the refund for M2?
- 4) What would you propose to the owner with a budget of $300 thousand?
How this answer is scored:
- Correctness (40): M1 - saving $117 thousand a year, payback 2.2 years, NPV about $622 thousand; M2 - $78 thousand a year, payback 2.3 years without the refund and 1.7 years with it, NPV about $343 thousand without the refund and $388 thousand with it; with a tariff 15 % lower both measures still pay (NPV about $490 and $310 thousand).
- Reasoning (25): with a budget of $300 thousand both measures do not fit at once (440 thousand); the choice is explained by NPV and NPV per dollar of cost and by the refund for M2 arriving only after a year; a sequence is proposed, for example M1 this year and M2 next year, or M2 and part of M1 in the zones with the longest operating hours.
- Risks and constraints (20): the baseline and its adjustment for operating hours and footfall, separate metering of ventilation, the refund conditions, uncertainty of the savings estimate.
- Clarity (15): the answer is structured in points, and figures and conclusions are stated explicitly.
In the exam each candidate gets their own figures and conditions. An answer whose calculation does not rest on the figures of the candidate's own variant gets no more than 19 of 40 points for correctness.
06. How is the exam scored?
An examiner scores the answers against a rubric. Each task is scored on four criteria; the total is converted to 100 points using the section weights.
- Correctness of the solution - 40 %.
- Reasoning behind decisions - 25 %.
- Risks and constraints - 20 %.
- Clarity - 15 %: structure and precise wording. Grammar and style do not lower the score if the meaning is clear.
07. Result and certificate
- Pass mark - 70 of 100.
- Those who pass receive an IAE Certified Professional certificate stating the field "Engineering Projects: Construction and Energy", valid for 3 years; scores by section are in a separate report.
- The certificate confirms the result of the IAE exam. It is not a license or authorisation for design, survey or construction work and gives no right to sign design documents.
- Result timing, appeals, retakes and fees: the Exam terms page.
- The Credentialing Council reviews the program at least once a year.
08. What is out of scope?
The exam tests project decisions, not engineering design. It does not cover structural or electrical design calculations that by law are done and signed by a licensed engineer (in the US a Professional Engineer, PE; in other countries a person authorised under local law). Where a decision needs such a calculation, the task says it is done by an authorised engineer, and the candidate assesses its effect on time, cost and risk.
- Design calculations for structures, foundations and ground.
- Calculations for electrical networks and protection, cable and equipment sizing for loads.
- Design and equipment selection for heating, ventilation and air conditioning.
- A particular country's fire safety and occupational safety codes: tasks use general principles (hierarchy of controls, permits to work, injury recording).
- Interpretation of a particular country's law: contract tasks are solved on the terms given in the task.
09. Preparation
- Revise network schedule calculations (forward and backward pass, total and free float) and cost-based schedule compression.
- Revise the earned value formulas (CV, SV, CPI, SPI, EAC, TCPI) and how to read them by work package.
- Study contract terms on variations, notices, extensions of time, liquidated damages, payments and retention: the tasks give the terms, and you need to apply them.
- Revise simple payback and NPV with an annuity factor, weather-adjusted verification of savings, and the sequence of testing and handover.
- Answer with the figures of your own variant: the formula, your values, the conclusion and the condition under which it changes.
- In the questionnaire, describe a construction or energy project where you were responsible for schedule, cost, contract or handover: the project question is built on this description.
- Useful material: the PMBOK Guide (PMI), AACE International recommended practices on scheduling and earned value, the FIDIC and NEC forms of contract, ASHRAE Guideline 0 on the commissioning process, the IPMVP protocol on verifying savings. The exam does not test knowledge of their text.
- The practice exam has tasks in the same format; see the Exam terms page.