Expert report review
Deposing the opposing surveyor: which questions come from the review?
A party may depose the opposing land surveyor once the surveyor's written report is served, and absent a stipulation or court order the deposition lasts one day of 7 hours (Federal Rules of Civil Procedure 26(b)(4)(A) and 30(d)(1)). A review of the report, done first, lists the field notes, data files and record documents to demand and the corners, measurements and record decisions to ask about. The party taking the deposition pays the surveyor's reasonable fee.

When can the opposing surveyor be deposed?
After the surveyor's written report is served. Absent a stipulation or court order the deposition is limited to one day of 7 hours, and deposing the same surveyor a second time requires leave of court.
Rule 26(b)(4)(A) of the Federal Rules of Civil Procedure reads: "A party may depose any person who has been identified as an expert whose opinions may be presented at trial." If Rule 26(a)(2)(B) requires a report from that expert, "the deposition may be conducted only after the report is provided." A surveyor retained to testify about a boundary writes such a report. It states every opinion with its basis and reasons, the facts or data considered, the plats and other exhibits, the surveyor's publications from the previous 10 years, the cases in which he testified during the previous 4 years and his compensation.
The Advisory Committee expected the report to shorten this discovery. Its note to the 1993 amendment says the report may "eliminate the need for some such depositions or at least reduce the length of the depositions." Counsel decides that question after a review of the report. The reviewer lists each opinion with the record, the field evidence and the computation behind it, and each gap in that list becomes a question.
Rule 30(d)(1) limits a deposition to "1 day of 7 hours" unless the parties stipulate or the court orders otherwise, and the court "must allow additional time" if it is needed to examine the deponent fairly. The note to the 2000 amendment adds that "with regard to expert witnesses, there may more often be a need for additional time." Under Rule 30(a)(2)(A)(ii), without a stipulation a party needs leave if "the deponent has already been deposed in the case." A survey with several disputed corners is examined corner by corner, and the outline is planned to fit one session.
Which survey files should be demanded before the deposition?
Field notes, raw data files from the instruments, the coordinate list, the deeds, plats and earlier surveys the surveyor used, and photographs of each monument. Drafts of the report and most communications with counsel stay protected.
Under Rule 30(b)(2), if a subpoena duces tecum is to be served on the deponent, the materials to be produced "must be listed in the notice or in an attachment." A notice to a party deponent "may be accompanied by a request under Rule 34 to produce documents and tangible things at the deposition."
The note to the 2010 amendment of Rule 26 says the phrase "facts or data" is to be read broadly, reaching "any material considered by the expert, from whatever source, that contains factual ingredients." Disclosure covers what the surveyor considered, including material he did not rely on. The same note says that the protection for drafts and attorney communications does "not impede discovery about the opinions to be offered by the expert," including the expert's "testing of material involved in litigation, and notes of any such testing." For a surveyor, the field notes and the files recorded by the total station or the GNSS receiver are the record of that testing.
In a boundary case the list follows the report: the title commitment and record description the surveyor received, the deeds of the parcel and of each adjoiner, recorded plats, earlier surveys of the same line, field notes and sketches, raw measurement files, the control points and the coordinate list, the computation of each corner that was set rather than found, and dated photographs of each monument. Every item that the report cites and the production lacks goes into the subpoena.
Drafts of the report are protected under Rule 26(b)(4)(B) in whatever form they are recorded. Communications between counsel and the surveyor are protected under Rule 26(b)(4)(C) except those about compensation, facts or data counsel provided and the surveyor considered, and assumptions counsel provided and the surveyor relied on. If counsel told the surveyor to treat a fence as the line or to accept the client's account of where a corner stood, that instruction falls within the third exception and can be asked about.
What should be asked about the record research?
Which deeds, plats and earlier surveys the surveyor obtained, who supplied them, which ones he plotted and how he resolved conflicts between them. Recorded documents can come in under hearsay exceptions 803(14) and 803(15).
The 2026 Minimum Standard Detail Requirements for ALTA/NSPS Land Title Surveys, effective February 23, 2026, open their section on records research with the statement that the surveyor "must be provided with appropriate and, when possible, legible data that can be relied upon." The list includes the latest title commitment (4.A), the current record description of the property (4.B) and recorded easements benefitting or burdening it (4.C). If those documents are not provided, the surveyor completes the research the jurisdiction requires and any research negotiated in the contract. The first questions ask which documents came from the client or counsel and which the surveyor found himself.
Under Rule 803(14) of the Federal Rules of Evidence, the record of a document that purports to establish or affect an interest in property is not excluded by the rule against hearsay if the record is kept in a public office and a statute authorizes recording documents of that kind there. Rule 803(15) covers a statement in such a document if the matter stated was relevant to the document's purpose, "unless later dealings with the property are inconsistent with the truth of the statement or the purport of the document." Rule 803(16) covers a statement in a document prepared before January 1, 1998, whose authenticity is established. An old deed or plat that the opposing surveyor set aside may still reach the factfinder, and the deposition asks why he set it aside.
Burleson v. United States, a boundary case in the Western District of Tennessee, gives an example of such a decision. The last survey to describe the disputed line was prepared in 1941 by J. L. Sloan. The government's surveyor, Walter D. Bennett, did not rely on it: its beginning point "has been washed away by the Hatchie River," and he did not find a marked box elder tree. He used a line of trees together with deeds to adjoining tracts, boundaries resolved in a 1979 lawsuit and aerial photographs of the area. A deposition takes each rejected record in turn and asks for the reason in the surveyor's own words.
How is the surveyor questioned about monuments and corners?
Corner by corner: what he searched for, what he found, its size, character and type, whether he accepted it, and which note on the plat explains each fundamental decision about the boundary.
Section 5.A.i of the 2026 ALTA/NSPS standard requires the surveyor to locate and describe "The location, size, character (including relationship to surface of the ground), and type of any monuments found during the fieldwork." Under section 6.A the plat shows the evidence gathered and the monuments and lines located during the fieldwork. Under section 6.B.viii, when the results differ significantly from the record, or when a fundamental decision about resolving the boundary does not appear clearly on the plat, the surveyor "must explain this information with notes on the face of the plat or map."
In Burleson the plaintiffs described the steps a careful surveyor takes: "examine the records available, plot those deeds up in the survey, go out in the field, locate any field evidence, such as property corners, angles, fences, monuments and the like and make necessary computations in order to match them with the deeds." Once the corners are determined, they wrote, the surveyor goes back to the site, checks the information and then writes a description of the property. Magistrate Judge Charmiane G. Claxton found that Bennett's report "details the steps that he took and includes substantially all of the steps listed by Plaintiffs." The same list works as a deposition outline, one step per group of questions.
- Which monuments did you search for at this corner, and which did you find?
- What are the size, material and type of each monument found, and how does it sit relative to the ground surface?
- Which monuments did you accept, which did you reject, and for what reason?
- Where you set a corner rather than found one, how did you compute its position?
- Which note on the plat explains your decision on the disputed line?
Which questions test the measurements?
Questions on the basis of bearings, the measured dimensions that differ from the record, the control and instruments used, the dates of the fieldwork, and the precision between adjacent corners that the survey claims.
Section 3.E.i of the ALTA/NSPS standard defines relative positional precision as the length of the semi-major axis of the error ellipse of the line connecting the monuments or witnesses that mark adjacent boundary corners, at the 95 percent confidence level. Section 3.E.v sets the maximum at "2 cm (0.07 feet) plus 50 parts per million (based on the direct distance between the two corners being tested)." On a line of 500 feet, 50 parts per million adds 0.025 feet, for a total of 0.095 feet.
Under section 6.B.iii, where a measured or calculated dimension "differs from the record by an amount deemed significant by the surveyor," the plat shows it in addition to the record dimension. Section 6.B.iv requires "The basis of bearings and, where it differs from the record basis, the difference." The deposition asks what amount the surveyor treated as significant and why, which line or coordinate system served as his basis of bearings and how he rotated the record calls to it.
A plat that claims compliance with the 2026 standard carries the certificate in section 7, which gives the date on which "The fieldwork was completed." Questions about dates follow: when each corner was measured, whether a fence, a wall or a monument changed between the fieldwork and the plat, and whether a later visit was recorded. A survey made under a state minimum standard is checked against the standard named on the plat.
The surveyor is also asked which instruments he used, which control points he occupied and how many independent measurements he took of each disputed corner. These answers go to Rule 702(b), which requires testimony "based on sufficient facts or data."
What should be asked about fences, walls and reputation?
Which lines of occupation the surveyor located, how he described them on the plat, and who told him where the line ran and when. Boundary reputation qualifies under Rule 803(20) only if it arose before the controversy.
Section 5.C.i of the ALTA/NSPS standard requires "The character and location of evidence of possession or occupation along the perimeter of the surveyed property." A fence, a hedge, an old wall or a mowing line on the plat gives the deposition its questions: when the surveyor located it, how far it stands from the line he set, and whether he treated it as evidence of the original line or set it aside.
Rule 803(20) excepts from the rule against hearsay a reputation in a community, "arising before the controversy," concerning boundaries of land in the community. The Advisory Committee note says the exception was "expanded in this country to include private as well as public boundaries" and that "The reputation is required to antedate the controversy, though not to be ancient."
If the surveyor talked to neighbors or former owners in the field, the deposition asks for the name of each person who gave an account of the line, the date of the conversation, whether it came before or after the dispute began and where it appears in the field notes. An account given after the dispute began does not meet Rule 803(20), and the surveyor is asked which of his conclusions would change without it.
What if the surveyor never surveyed the ground?
The deposition records what the opinion rests on and what work remains. In Town of Alburgh v. Murphy a Vermont court kept a surveyor's preliminary opinion in the case but made the town pay for his second deposition.
In Town of Alburgh v. Murphy, No. 24-CV-01960, the Town disclosed one expert, licensed land surveyor Michael Gervais, on the location of a town highway near Center Bay Beach. His disclosure, dated February 27, 2026, attached a one-page "Preliminary opinion." He wrote that he "cannot determine with 100% accuracy the location of the surveyed location of the roads" and that "Additional work, including physical inspection, is necessary to confirm the exact location."
The defendants deposed Gervais on April 14, 2026. He testified that he had worked from documents the Town or its attorney gave him and had not prepared maps or surveys or researched town land records because he had not been asked to. The Town said that weather and elevated lake water levels had made a physical survey difficult.
In a ruling signed August 11, 2026, Judge Megan J. Shafritz of the Vermont Superior Court wrote that Rule 26(e) "is not a vehicle to permit a party to serve a deficient opening report." She denied the motion to exclude, finding no substantial prejudice and partial responsibility on both sides, gave the Town 30 days to disclose further opinions and ordered it to pay the defendants' reasonable attorney's fees and expenses for any second deposition and for the motion. "Defendants should not have to bear the expense of the Town's mistakes and its failure to comply with court-imposed deadlines," she wrote.
Federal Rule of Evidence 703 lets an expert base an opinion on facts or data "that the expert has been made aware of or personally observed." Section 5 of the ALTA/NSPS standard requires fieldwork "using practices generally recognized as acceptable by the surveying profession." The deposition therefore asks which data replaced the field visit, whether surveyors rely on that kind of data for a boundary opinion and what work the surveyor still plans before trial.
How do the answers support a Rule 702 motion?
Each answer is matched to a Rule 702 requirement: sufficient facts or data, reliable methods, reliable application. In Burleson the court left the choice between two qualified surveyors to the factfinder.
Rule 702 requires the party offering the surveyor to show the court that "it is more likely than not" that the testimony "is based on sufficient facts or data," that it "is the product of reliable principles and methods" and that the opinion applies those principles and methods reliably to the facts of the case. The committee note to the 2023 amendment calls rulings that treat the sufficiency of an expert's basis as a question of weight "an incorrect application of Rules 702 and 104(a)."
The 2000 note sets the test for opinions based on experience. A witness relying solely or primarily on experience "must explain how that experience leads to the conclusion reached, why that experience is a sufficient basis for the opinion, and how that experience is reliably applied to the facts." A surveyor who says he held a stone or a pipe "from experience" is asked those three questions, and the transcript of his answers goes with the motion.
Rule 705 lets an expert state an opinion "without first testifying to the underlying facts or data," but "the expert may be required to disclose those facts or data on cross-examination." The deposition puts those facts on the record before trial.
In Burleson, a disagreement between two surveyors was not a ground to exclude one of them. Judge Claxton recommended that the motion to exclude Bennett be denied. She wrote that "resolution and reconciliation of competing expert reports and testimony is a credibility issue reserved for the trier of fact" and that the gatekeeper doctrine "is largely irrelevant in the context of a bench trial." Quoting a Sixth Circuit decision that relied on Daubert, she repeated that "Vigorous cross-examination, presentation of contrary evidence, and careful instruction on the burden of proof are the traditional and appropriate means of attacking shaky but admissible evidence."
Who pays the surveyor for deposition time?
The party taking the deposition pays the surveyor a reasonable fee for the time spent, unless manifest injustice would result. A court can also shift the cost of a repeat deposition, as the Vermont court did.
Rule 26(b)(4)(E)(i) provides that, "Unless manifest injustice would result," the court must require the party seeking discovery to "pay the expert a reasonable fee for time spent in responding to discovery under Rule 26(b)(4)(A) or (D)." The 1993 note says that "the expert's fees for the deposition will ordinarily be borne by the party taking the deposition."
The report states the surveyor's compensation under Rule 26(a)(2)(B)(vi), and Rule 26(b)(4)(C)(i) leaves communications about compensation outside the protection for attorney-expert communications. The deposition can cover the hourly rate, the hours billed for fieldwork and for office work, and the dates on the invoices for fieldwork.
In Town of Alburgh the court put the cost of a second deposition on the party whose surveyor had served a preliminary opinion. The defendants were to send their fee requests to the Town and could move the court if the parties disagreed on the amount or the timing.
What happens after the deposition?
If review is requested before the deposition ends, the surveyor has 30 days to review the transcript and list changes. New work and changed opinions must be disclosed by the pretrial disclosure deadline.
Under Rule 30(e)(1), on a request made before the deposition is completed, the deponent "must be allowed 30 days after being notified by the officer" that the transcript or recording is available, to review it and sign a statement listing changes in form or substance and the reasons for them. The reviewer reads that statement against the transcript and the plat. A moved corner, a new basis of bearings or a different reason for rejecting a deed is a change of substance.
Under Rule 26(e)(2), the duty to supplement for an expert who gives a report extends "both to information included in the report and to information given during the expert's deposition." Additions and changes are due by the time of the pretrial disclosures under Rule 26(a)(3). Rule 37(c)(1) bars a party that fails to disclose as Rule 26(a) or (e) requires from using that information "on a motion, at a hearing, or at a trial, unless the failure was substantially justified or is harmless."
One more question belongs at the end of the session: which manuals, textbooks and state standards the surveyor treats as authoritative. Under Rule 803(18), a statement in a treatise, periodical or pamphlet may be read into evidence if it is called to an expert's attention on cross-examination and the publication is established as a reliable authority, including "by the expert's admission or testimony." The answer given at the deposition can supply that foundation at trial.
What does IAE do when a party has to depose the opposing surveyor?
IAE prepares a review of the opposing surveyor's report, deposition questions and a rebuttal survey report for boundary, quiet title and encroachment cases in US courts. Delivery takes up to 5 business days.
The reviewer reads the opposing survey with its field notes, plats and record documents and ties each point to a rule or a standard: which records the survey used, which monuments it found and how its measurements compare with the record. The review lists the gaps in the order of the plat, and counsel builds the deposition outline from them. A rebuttal survey report is due within 30 days after the opposing disclosure unless the court sets other dates.
For an expert report on the client's questions, the surveyor collects the deeds, recorded plats and original field notes for the parcel and its neighbors, searches for the original monuments, measures with GNSS and a total station and compares measured bearings and distances with the calls in each deed. Both parties' descriptions are plotted on one map, and fences, driveways and buildings are located relative to the line.
A review answers six questions about the opposing report: whether the method fits the object and was followed at every stage, whether all objects, materials and questions were examined, whether the conclusions follow from the examination, whether the expert's education, specialty and experience match the subject, whether the report meets the form and procedure of the jurisdiction, and whether it can be relied on. The client sends the opposing survey with its field notes, plats and record documents.
The secretariat confirms receipt the same day. Within one business day IAE confirms the format, the cost, the deadline and the specialist from its registry, and the client approves the candidate and the CV before work starts. The 5 business days run after the format and cost are confirmed, and cases with tight deadlines have a 48-hour rush. Every specialist is a member of the public IAE registry, verified by Member ID or QR code, and confirms in the document that he or she has no interest in the outcome. The court weighs a review together with the other evidence, and neither IAE nor the surveyor guarantees the outcome. IAE is not a law firm and does not advise on case strategy.
Sources
- Federal Rules of Civil Procedure, Rule 26, Duty to Disclose; General Provisions Governing Discovery, with Committee Notes (LII)
- Federal Rules of Civil Procedure, Rule 30, Depositions by Oral Examination, with Committee Notes (LII)
- Federal Rules of Civil Procedure, Rule 37, Failure to Make Disclosures or to Cooperate in Discovery; Sanctions (LII)
- Federal Rules of Evidence, Rule 702, Testimony by Expert Witnesses, with Committee Notes (LII)
- Federal Rules of Evidence, Rule 703, Bases of an Expert's Opinion Testimony (LII)
- Federal Rules of Evidence, Rule 705, Disclosing the Facts or Data Underlying an Expert's Opinion (LII)
- Federal Rules of Evidence, Rule 803, Exceptions to the Rule Against Hearsay, with Committee Notes (LII)
- Minimum Standard Detail Requirements for ALTA/NSPS Land Title Surveys, effective February 23, 2026 (PDF published on oklahoma.gov)
- Burleson v. United States, No. 07-2151-JPM-cgc (W.D. Tenn.), Report and Recommendation on Motion to Exclude the Defendant's Expert Surveyor, January 21, 2010
- Town of Alburgh v. Murphy, No. 24-CV-01960 (Vt. Super. Ct., Chittenden Unit, Aug. 11, 2026), Ruling on Motion to Exclude Expert
Read also
All articles
The other side relies on a county GIS map: is it evidence of the boundary, and what does a reviewing surveyor check?
County GIS parcel lines are drawn for assessment, and the counties that publish them say so. Sedgwick County, Kansas, describes its boundaries as
Adverse possession survey: what does a reviewer check in the opposing surveyor's map of the claimed strip?
An adverse possession claim to a strip of a neighbor's land stands on two maps: the record line and the area actually possessed. The opposing
Building in a utility easement: how does the survey prove the encroachment, and when must the structure come down?
A structure built inside an easement stays or goes on two things: the words of the easement and the measurements on the ground. In a 2011 caseExpert report review
Ready to discuss your case?
Send the materials: the secretariat will confirm the format, cost, deadline and the specialist within one business day.