Examinations
Neighbor removed the survey markers: is it illegal, who pays to reset them, and what does the surveyor document?
A survey is finished, the corners are pinned, and a week later the pins are gone. In Washington intentionally disturbing a survey monument is a gross misdemeanor, and the person who did it is liable for the cost of the reestablishment. Missouri adds a civil claim for surveying costs and attorneys' fees. Removing the pin does not move the line: the surveyor's record fixes where the corner was and what it cost to set it again.

Is it illegal to remove survey stakes or pins?
Washington, Missouri and Pennsylvania make it a crime to disturb a monument set by a licensed surveyor, and federal law protects the monuments of government surveys. The grade differs: a summary offense, a class B misdemeanor, a gross misdemeanor.
Washington's statute is one sentence long. Under RCW 58.04.015, "A person who intentionally disturbs a survey monument placed by a surveyor in the performance of the surveyor's duties is guilty of a gross misdemeanor and is liable for the cost of the reestablishment."
Missouri bars everyone except a registered land surveyor. Under section 60.355 of the Revised Statutes no other person "shall knowingly move, remove, deface or destroy any corner of the United States Public Land Survey System, property boundary marker, bench mark or horizontal control monument." A violation is a class B misdemeanor.
Pennsylvania grades the offense by purpose. Under 18 Pa.C.S. 3312 a person commits a summary offense if he intentionally cuts, injures, damages, destroys, defaces or removes a survey monument or marker. The offense becomes a misdemeanor of the second degree when the act is willful or malicious and is done "in order to call into question a boundary line."
Federal law covers government surveys. Under 18 U.S.C. 1858 whoever willfully destroys, defaces, changes or removes to another place any section corner, quarter-section corner or meander post on any Government line of survey, or willfully defaces, changes or removes any monument or bench mark of any Government survey, is fined or imprisoned for not more than six months, or both. The statute also covers cutting down a witness tree or a tree blazed to mark the line.
Which markers do these statutes protect?
Monuments that a licensed surveyor set or adopted to define a boundary, and the corners and bench marks of government surveys. Pennsylvania's definition excludes a wooden stake placed by a surveyor as a temporary marker or placeholder.
Pennsylvania defines a survey monument or marker as any object adopted or placed by a professional land surveyor to define the boundaries of a property, including natural objects such as trees or streams and artificial monuments such as iron pins, concrete monuments, set stones or party walls. The word "adopted" matters: an old set stone that a surveyor found and accepted as the corner is protected in the same way as a new iron pin. The same definition says the phrase "does not include a wooden stake placed by a professional land surveyor as a temporary marker or placeholder."
Under the Pennsylvania definition the wooden lath that a crew leaves along a line so that a fence builder can see it is a temporary marker. The iron pin at the corner is the monument. An owner who pulls lath out of the lawn after the fence is built has not touched the monument, and an owner who pulls the pin has.
Washington's statute protects a monument placed by a surveyor in the performance of the surveyor's duties. Missouri lists four things: a corner of the Public Land Survey System, a property boundary marker, a bench mark and a horizontal control monument. Whether a particular object falls inside the local definition is a question the surveyor's records answer, because the plat or the survey report says what was set at each corner and when.
Does removing a pin move the property line?
No. The pin marks a corner whose position is fixed by the deeds, the recorded plats and the survey. A surveyor can set it again in the same place, and the Washington, Missouri and Pennsylvania statutes speak of reestablishment.
A neighbor who pulls a pin has removed the visible evidence of the corner and nothing else. The deed descriptions, the recorded plat, the survey report and the surveyor's field measurements are unchanged, and the corner can be set again out of them. The Washington, Pennsylvania and Missouri statutes all speak of the cost of reestablishment.
California law shows how surveyors plan for this. Under section 8771(b) of the Business and Professions Code, when monuments exist that control the location of boundaries, roads or streets, they must be located and referenced by or under the direction of a licensed land surveyor or licensed civil engineer before streets, rights-of-way or easements are improved, constructed, resurfaced or relocated. Under subdivision (c) a permanent monument is reset in the surface of the new construction, and a corner record or record of survey is filed with the county surveyor. The references and the filed record let another surveyor put the point back.
What removal changes is cost. Before a fence is built or a line is shown to a buyer, the corner has to be set again, and the Washington and Missouri statutes put that cost on the person who removed the monument.
Who pays to put the marker back?
The person who removed it. Washington makes that person liable for the cost of the reestablishment, Pennsylvania adds attorney fees after a conviction, and Missouri gives the affected owner a civil action for surveying costs and attorneys' fees.
Pennsylvania's subsection (b), headed "Restitution," applies to any person convicted of violating the section. In addition to any other penalty imposed, that person is liable for the cost of the reestablishment of permanent survey monuments or markers by a professional land surveyor and all reasonable attorney fees.
Missouri's section 60.355 is the fullest. A violator is liable for the cost of reestablishment of permanent monuments or markers by a registered land surveyor. The section establishes a civil cause of action in favor of any owner of real estate whose boundaries are affected by the violation. Venue is in the county where the violation occurs. Damages "shall be limited to reasonable surveying costs and reasonable attorneys' fees."
The limit in the Missouri text is as informative as the grant. The statute pays for the surveyor and the lawyer. It does not pay for a fence built in the wrong place because the pin was missing or for a sale that fell through, and a claim for those losses has to rest on some other theory.
The measure of the claim is therefore a document: the surveyor's invoice for the reset, with the date, the corners reset and the method. An owner who expects to claim it asks the surveyor to describe the reset as a separate item.
How is the removal proved, and what does the surveyor document?
Each statute requires a mental state: intentionally, knowingly, willfully. The surveyor documents that the monument was set, where, that it is now missing or moved, and what was done to reset it. Who removed it is proved by other evidence.
The words differ by state. Washington requires that the person intentionally disturbed the monument. Missouri requires that the person knowingly moved, removed, defaced or destroyed it. Pennsylvania's summary offense requires that the person acted intentionally, and its higher grade requires willful or malicious conduct aimed at calling a boundary line into question. The federal statute requires that the act be willful. An accidental strike, such as a mower hitting a rod flush with the ground, lacks the mental state these statutes name.
The surveyor's part is the before and the after. Before: the plat or survey report showing what was set at each corner, the field notes, the dated photographs of each monument, and the coordinates. After: a site visit recording that the monument is absent or displaced, the condition of the ground, any monument found lying nearby, and the measurements used to set the point again.
Identity comes out of other evidence, such as photographs, camera footage, a witness or the neighbor's own messages. The surveyor does not give an opinion on who pulled the pin. In litigation the surveyor's report under Rule 26(a)(2)(B) of the Federal Rules of Civil Procedure lists the facts or data considered, and under Rule 702 of the Federal Rules of Evidence the proponent must show that it is more likely than not that the opinion rests on sufficient facts or data and reliable methods reliably applied.
The timing of the record matters. A photograph of each monument taken on the day it was set, with a tape or a rod in the frame and the cap legible, is the record that the pin existed and where it stood.
What if a contractor or a road crew destroyed the marker?
In California the duty runs to whoever performs or permits the work. Section 8771 requires that controlling monuments be located and referenced before construction and reset afterwards, and makes the governmental agency responsible for seeing that this is done.
Monuments in streets and along rights-of-way are also lost to paving, trenching and grading. California addresses this in section 8771 of the Business and Professions Code. Subdivision (a) requires monuments to be sufficient in number and durability and efficiently placed so as not to be readily disturbed. Subdivision (b) requires existing controlling monuments to be located and referenced before the work, and subdivision (c) requires a reset monument and a corner record or record of survey filed with the county surveyor.
Subdivision (d) assigns the responsibility: the governmental agency performing or permitting construction or maintenance work is responsible for seeing that either the agency or the landowner performing the work provides for monument perpetuation. Subdivision (e) makes it the duty of every licensed land surveyor or licensed civil engineer authorized to practice land surveying to assist the governmental agency in matters of maps, field notes and other pertinent records.
For an owner whose corner disappeared during street or utility work beside the lot, the first question is whether the monument was referenced before the work and whether a corner record was filed. If it was, the monument can be reset out of the recorded references. If it was not, the owner raises the cost of a new survey with the agency or the party that did the work.
Can I pull the other side's pins if I think their survey is wrong?
No. In Missouri only a registered land surveyor may move a boundary marker. In Pennsylvania removing a marker to call a boundary line into question is a second-degree misdemeanor, and improper placement is only an affirmative defense.
The Pennsylvania statute is written for this situation. An owner who believes that the neighbor's surveyor set the pins a foot too far over, and willfully removes them for that reason, has acted to call a boundary line into question, which is the element that raises the offense to a misdemeanor of the second degree. Subsection (c) gives the defendant an affirmative defense: that the survey monument or marker was improperly placed by a professional land surveyor. The defense is raised in a prosecution, after the removal, and the owner then has to show that the placement was improper. The Washington and Missouri sections quoted above contain no such defense.
The lawful answer is a second measurement. The owner's surveyor retraces the line out of the deeds and plats, locates the neighbor's monuments and reports the difference in bearings, distances and area. If the parties are in court, Rule 34(a)(2) of the Federal Rules of Civil Procedure lets a party request entry onto land possessed or controlled by the other side to inspect, measure, survey or photograph it, with a written response due within 30 days after service.
Two sets of pins in the ground are evidence. Each set marks the place where a surveyor put the line and can be measured by the other side's expert and by a court-appointed surveyor. A set that has been pulled can only be described by the party who paid for it.
What does IAE do in a dispute over removed or disputed monuments?
IAE prepares a boundary survey expert report on the client's questions and a review of the opposing surveyor's report for boundary, quiet title and encroachment cases, in up to 5 business days after the format and cost are confirmed.
The boundary and land survey page describes three parts of the work. In record research the surveyor collects deeds, recorded plats and original field notes for the parcel and its neighbors. In field retracement the surveyor searches for the original monuments, measures with GNSS and a total station and compares measured bearings and distances with the calls in each deed. For overlaps and encroachments both parties' descriptions are plotted on one map, and the surveyor computes the area of each overlap or gap and locates fences, driveways and buildings relative to the line.
A review of the opposing surveyor's report checks that field notes, control points and record documents are on the list of facts or data considered and that each opinion follows out of them. A survey report that only rebuts the other side's surveyor on the same subject is due within 30 days after that disclosure under Rule 26(a)(2)(D)(ii), unless the parties stipulate or the court orders otherwise.
The client sends the deeds, plats and any prior surveys, photographs of the monuments before and after, the invoice for any reset and the questions. The secretariat confirms receipt the same day. Within one business day IAE confirms the format, the cost, the deadline and the specialist chosen in its registry, and the client approves the candidate and the CV before work starts. Cases with tight deadlines have a 48-hour rush.
Registry members passed the collegial attestation of the council under the published Criteria Matrix, and the Member ID or QR code in the document opens the specialist's record. The specialist confirms in the document that he or she has no interest in the outcome of the case. The report is evidence the court weighs with the other materials. Neither IAE nor the surveyor guarantees the outcome, and IAE is not a law firm: whether to press charges or sue is a question for counsel.
Sources
- Revised Code of Washington, RCW 58.04.015, Disturbing a survey monument (Washington State Legislature)
- Missouri Revised Statutes, section 60.355 (Revisor of Statutes, State of Missouri)
- 18 Pa.C.S. 3312, Destruction of a survey monument (Pennsylvania General Assembly)
- 18 U.S.C. 1858, Survey marks destroyed or removed (LII, Cornell Law School)
- California Business and Professions Code, section 8771 (California.Public.Law)
- Federal Rules of Civil Procedure, Rule 34 (LII, Cornell Law School)
- Federal Rules of Civil Procedure, Rule 26 (LII, Cornell Law School)
- Federal Rules of Evidence, Rule 702 (LII, Cornell Law School)
Read also
All articles
Tree on the property line: who owns it, and how does a surveyor show where the trunk stands?
In California ownership of a tree follows its trunk: a tree whose trunk stands wholly on one lot belongs to that owner, and a tree whose trunk stands
Road right of way and the property line: where does the public road end and my lot begin?
Where a lot meets a public road, the line is the edge of the right of way or a line the deed sets, not the edge of the pavement. In Florida a road
Neighbor built too close to the property line: how does a surveyor prove a setback violation, and what can be done about it?
A setback is the space a zoning code requires between a structure and the property line. A neighbor who builds inside it has not necessarily crossedExpert examinations
Ready to discuss your case?
Send the materials: the secretariat will confirm the format, cost, deadline and the specialist within one business day.